Place du Canada

1010 de la Gauchetiere
Montreal Downtown

LEASING INQUIRIES

Michael Coughlin mcoughlin@redbourne.ca

Telephone: 514-940-1555 x 360   Fax: 514-940-1549

1555 Peel Street, Suite 700, Montreal (Quebec) H3A 3L8 Canada

AVAILABILITIES
Suite Floor Area
(sq.ft.)
Contiguous
Area(sq.ft.)
Availability
(mm/yy)
FLOOR
PLAN
SUITE
PLAN
2260 22 3,800 N/A Immediate N/A
2280 22 3,147 N/A Immediate N/A
2105 21 1,112 N/A Immediate N/A
2110 21 1,194 N/A Immediate N/A
2010 20 4,604 N/A Immediate N/A
1910 19 4,943 N/A Immediate N/A
1200 12 17,245 N/A Immediate N/A
1000 10 9,180 N/A Immediate N/A
900 9 9,754 N/A Immediate N/A
940 9 2,853 N/A Immediate N/A
500 5 17,245 N/A Immediate N/A
400 4 17,245 N/A Immediate N/A
200 2 16,699 N/A Immediate N/A
110 1 2,188 N/A Immediate N/A
M120 MEZZANINE 1,502 N/A Immediate N/A
M170 MEZZANINE 1,332 N/A Immediate N/A
P050 PROMENADE 504 N/A Immediate N/A
P055 PROMENADE 1,291 N/A Immediate N/A
P060 PROMENADE 2,797 N/A Immediate N/A
B230 BASEMENT 338 N/A Immediate N/A N/A
B250 BASEMENT 178 N/A Immediate N/A N/A
BUILDING SPECIFICATIONS
Built:1968 renovated in 2017
Floors:22
Washrooms:One men's and one women's washroom per floor.
Parking:361 Underground parking stalls. Two entrances, one on Peel Street and one on de la Cathedrale Street
Freight Elevators:1
Windows:Aluminum frame fixed windows
Structure:Conventional footings and foundations walls, interior concrete columns supported by pad footings
Elevators:Eight passenger elevators for the tower (two banks of four) as well as four parking shuttle elevators which were manufactured by Otis.
HVAC hours:7:00 am - 7:00 pm. Monday – Friday, except holidays and Saturday 7 am. – 3 pm. Hours can be extended at an additional cost to the tenant.
Air Exhaust:Induction units placed both on the perimeter and interior constant volume distribution system. The temperatures ranges between 70 and 74 degrees Fahrenheit.
Lighting:T8 fluorescent fixtures, compact fluorescent. LED lighting to be installed during renovations.
Fiber Optics:Fiber Optic Cabling available throughout the building.
Security:24-hour security personnel on site. Closed circuit video surveillance system.
Sprinklers:Property fully sprinklered to meet code requirements.
Fire Detectors:Heat and smoke devices to meet safety requirements. Property features a zoned fire alarm system.
Personnel:Maintenance personnel on site.
LOCATION
STACKING PLANS
23
 
 
 
 
22
 
 
 
3800
 
3147
 
21
 
 
1112
1194
 
20
 
4604
19
 
4943
18
 
 
17
 
16
 
15
 
14
 
 
13
 
 
 
 
 
 
12
17245
11
 
 
10
9180
 
9
9754
2853
 
 
8
 
7
 
6
 
 
 
 
 
5
17245
4
17245
3
 
2
16699
1
 
2188
 
MEZZANINE
 
 
1502
1332
 
PROMENADE
 
 
504
1291
2797
 
 
BASEMENT
 
 
 
338
178